Skip to content
Wednesday, 18 November 2026
BREAKING
HEADLINES

Chennai to Build New Desalination Plant to Address Water Shortage

A new desalination plant in Chennai aims to alleviate the citys daily water shortage of 500 million liters.

Chennai, November 18 (Daily Kiran) : Chennai is facing a significant daily water shortfall of approximately 500 million liters. In response, the Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) has proposed the construction of a new desalination plant in Minjur, with a capacity of 400 million liters per day. The estimated cost of this ambitious project is around ₹4,800 crores.

The proposed facility is expected to enhance the supply of drinking water to northern Chennai, Avadi, Ponneri, and Minjur, addressing the increasing water demands of the rapidly expanding metropolitan area.

According to Metro Water, the daily water demand in Chennai and its metropolitan regions currently stands at 1,813.5 million liters. This figure is projected to rise to 3,253.4 million liters by 2057.

Currently, Metro Water supplies nearly 1,250 million liters of water to approximately 9.1 million residents across a 426 square kilometer area. This includes 25.16 million liters for Tambaram and 4 million liters for Avadi.

To meet drinking water needs, the board relies on five traditional water treatment plants, three existing desalination facilities, and groundwater sources. The total capacity of traditional treatment facilities located in Veeranam, Chembarambakkam, Puzhal, Kilpauk, and Surapet is 1,294 million liters. Renovation work is ongoing at the Puzhal and Surapet facilities.

Chennai’s existing desalination infrastructure includes a 100 million liters per day plant in Minjur and two facilities in Nemmeli with capacities of 100 million and 150 million liters. Additionally, 30 million liters are sourced from groundwater.

Given the limited opportunities to develop reliable surface water and groundwater resources, officials are focusing more on desalination to ensure long-term water security.

Metro Water has invited international bids from consultancy firms for the proposed Minjur plant. Their responsibilities will include conducting a feasibility study, preparing a detailed project report, and assisting with the tender process.

The new plant will be constructed on approximately 40 acres of land near the existing desalination facility in Kattupalli, utilizing reverse osmosis technology for seawater purification.

Chief Minister C. Joseph Vijay announced the project in the assembly on September 2, and the state government plans to seek financial assistance from the central government.

Meanwhile, construction of another 400 million liters per day desalination plant in Perur, costing ₹5,815 crores, is progressing rapidly, with about 75% of the work completed. The marine infrastructure has been finished, while treatment facilities and transmission pipelines are still under construction. Trial operations are expected to commence by September 2027, ahead of the scheduled timeline in October, benefiting the southern and western suburbs of Chennai.

Share