Indian Government Approves Second Container Terminal at Kamarajar Port
The Indian government has approved a second container terminal at Kamarajar Port, enhancing logistics and export capabilities.

Chennai, November 25 (Daily Kiran) : The Indian Cabinet, chaired by Prime Minister Narendra Modi, has approved the development of a second container terminal at Kamarajar Port in Chennai. This decision, announced on social media, aims to boost India’s capacity to handle some of the world’s largest container ships, reduce reliance on foreign ports, and enhance competitiveness in exports.
The new terminal will increase the port’s handling capacity by 2 million TEUs (twenty-foot equivalent units) annually, allowing direct access for large container vessels. This initiative is expected to lower logistics costs and reliance on international transshipment hubs, while also promoting manufacturing and exports in sectors such as automobiles, electronics, and engineering in South India. The project is anticipated to create jobs and stimulate economic activity.
Developed under a public-private partnership (PPP) model, the project is estimated to cost ₹4,288.26 crore. It will feature a 900-meter-long terminal with a design draft depth of 18 meters and will be implemented in two phases. The terminal will be equipped to handle vessels with capacities of up to 24,346 TEUs and lengths of up to 400 meters, thereby enhancing Kamarajar Port Limited’s ability to manage large sea routes and improve connectivity with international shipping lanes.
The project aims to meet the growing demand for container-based import-export goods from the Chennai-Ennore industrial and economic zone, as well as from the broader interior regions of South India. Key goods produced in the area include automobiles, auto components, engineering products, electronics, chemicals, and other manufactured items.
According to official statements, the estimated project cost, including GST, is ₹4,288.26 crore, with ₹2,429.32 crore allocated for the first phase and ₹1,858.94 crore for the second phase. The selected concessionaire will arrange for this investment under the DBFOT (Design, Build, Finance, Operate, Transfer) model. Additionally, a separate estimated dredging cost of ₹450 crore will be borne by Kamarajar Port Limited.



